5
Belt ConveyorsTriaxial
Frame60-180t/h
CapacityLimestone
Basalt
Granite
Cobblestone
Construction
Power plant
Dry mixing
Chemica
Construction
Mining
ZY-4 series mobile station is one integrated design on customer's request, in traditional production line use 2-3 vehicles for production, ZY-3 Series mobile station combines them to together, eliminates obstacles of crushing site, environment, complex foundation, steel frame foundation, and etc. It can be used in the operation of mobile crushing line, such as solid waste treatment of urban buildings, highway, railway, hydro power engineering and so on, breaking the limitation of small site.
Complete feed, crushing, screening process design to meet the customer's engineering stone processing and construction waste crushing integrated needs.
The hydraulic and mechanical support provided in the screening system can ensure the stability during operation, hydraulic lifting can flexible switch the work mode.
Each leg can rise independently, which can effectively to avoid the offset of support ground uneven and uneven intensity.
It can production directly without external belt conveyor, overload and iron removal protection system can protect the equipment from damage.
Model | Feeder Model | Primary Crusher | Second Crusher | Sreen Model | Iron Remover | Belt Conveyors | Frame | Capacity(t/h) | Hydraulic system |
ZY-4 E57C75 | GZD3090 | PE500x750 | CS75 | 3YS1548 | RCYD(C)-6.5 | 5 | Triaxial | 60-90 | Hydraulic lift |
ZY-4 J80C75 | GZD3090 | J6S80 | CS75 | 3YS1548 | RCYD(C)-6.5 | 5 | Triaxial | 70-100 | Hydraulic lift |
ZY-4 J80DG100 | GZD3896 | J6S80 | DG100 | 3YS1560 | RCYD(C)-6.5 | 5 | Triaxial | 80-120 | Hydraulic lift |
ZY-4 E90DG100 | GZD3896 | PE600x900 | DG100 | 3YS1560 | RCYD(C)-6.5 | 5 | Triaxial | 100-120 | Hydraulic lift |
ZY-4 E90DG160 | GZD3896 | PE600×900 | DG160 | 3YS1560 | RCYD(C)-6.5 | 5 | Triaxial | 150-180 | Hydraulic lift |
A professional team deeply understands customer needs and recommends suitable products to customers
After signing the order, provide the demand form to the facilities department and count the categories before leaving the factory
Inventory of required components for equipment, technical protocol comparison inspection, and process testing
Before the delivery of the complete set of equipment, installation, debugging, and self inspection must be completed
Standardize equipment installation, debugging, and maintenance work to ensure personal and equipment safety
Service hotline
Address
WEST 100M, THE INTERSECTION BETWEEN QIYUAN RD AND YUXI RD, XINGYANG, ZHENGZHOU, HENAN
©2023 Henan ZGM Industrial Technology Co.,Ltd Copyright